Geofoam Offers Performance and Efficiency for Bridge Reconstruction

Modern Contractor Solutions Magazine

Modern Contractor Magazine, April 2009

Originally published in Modern Contractor Magazine, April 2009

Full article (pdf)

Known as one of the Top 10 High-Tech metropolitan areas in the nation (as cited by Newsweek magazine), the city of Omaha, Nebraska, leads the nation by pursuing the most innovative technologies in virtually every field imaginable, not the least of which is road construction.  With more than 100 road construction projects currently under contract, the Nebraska Department of Roads (NDOR) strives to utilize the most effective and efficient construction products in its continuous improvement of the state’s road structures.

That is why, when NDOR officials decided to reconstruct the Pacific Street Bridge, they chose to use expanded polystyrene (EPS) geofoam for the below-grade void fill portion of the construction project.  By spring of 2008, Pacific Street, which provides commuters with convent access to and from downtown Omaha, was experiencing significant traffic congestion, decreasing the ease and efficiency of local commutes.

The Pacific Street Bridge, which spans Interstate 680, experienced the heaviest congestion, affecting the flow of both local and regional traffic.  It became apparent to NDOR officials that this situation required a remedy that would not only be effective in streamlining the flow of traffic, but could also be completed in a short time frame.

The NDOR decided to widen the bridge by adding one lane, while maintaining the current length of the bridge.  Construction, which was managed by Hawkins Construction Company, a local Omaha-based construction contractor, began in March 2008.

The existing 2:1 slope protection was removed and replaced by abutment walls allowing room for t he needed extra lane

Pacific Street Bridge, Nebraska:  The existing 2:1 slope protection was removed and replaced by abutment walls allowing room for the needed extra lane

In order to build an additional lane without lengthening the bridge, Hawkins had to first construct abutment walls at each end of the bridge.  To avoid creating excessive lateral pressures on the new abutments, a lightweight void fill material was needed for filling in the embankments.  Because of this requirement, the NDOR chose to use geofoam for this portion of the application.

After comparing a number of geofoam manufacturers, Hawkins Construction chose to use geofoam manufactured by Insulfoam, the nation’s largest manufacturer of block-molded expanded polystyrene.

“It was vital that we use a product that would not increase the amount of lateral load placed on the new abutments,” said Omar Qudus, NDOR Geotechnical Engineer.  “We chose to use geofoam because it would do just that, and would enable us to fill the embankments while still being able to build the additional lane.”

As this was the NDOR’s first specification of geofoam, Qudus and his team consulted multiple geofoam manufacturers in order to ensure that the geofoam was used correctly and in a way that would enhance both the performance of the bridge and the efficiency of the construction.

“We talked to a number of geofoam manufacturers,” says Qudus, ”because we wanted to make sure that we were using the geofoam product correctly. Insulfoam provided ample feedback and a detailed specification of how InsulFoam® GF can be used in this type of application.”

The construction project required a total of 2,045 cubic yards of type 15 EPS low-density geofoam blocks that were installed as void fill at the bridge abutments.

After pouring the abutment walls, the Hawkins crew installed the geofoam blocks, which not only provided easy handling, but also sped up the installation process. The use of geofoam eliminated both the need for surcharge and the settlement that is experienced with typical fill products, such as soil.

“We used geofoam for this project because we did not have enough time for both the surcharge and settlement that are typical with the application of traditional fill products,” says Qudus.

NDOR

Pacific Street Bridge, Nebraska

Hawkins’ on-site supervisor, Lance Winkler, agreed that the use of geofoam significantly reduced construction time. “With traditional fill products, we typically backfill with sand at 8-inch increments and then compact; with geofoam, we just placed the blocks in position and then backfilled the minimal area that was left with sand. The InsulFoam® GF made installation easier and more efficient.”

Installation of a drainage mat was also necessary in order to ensure that any water that might collect around the abutment would drain properly and decrease the potential for any damage that might be caused by moisture penetration. By ensuring that water drained away from the abutment, the drainage mat would also eliminate the horizontal pressure that standing water would create.

The entire construction project was completed by September 2008, a short 6 months after it was started, and the bridge was re-opened to traffic. The use of geofoam in this project not only offered enhanced labor and cost savings, but also provided the increased, long-term stability and superior performance needed for the ever-moving technological hub of Omaha, Nebraska.

 Full article (pdf)

 

INSULFOAM GEOFOAM QUESTIONS

Nico Sutmoller, Insulfoam Geofoam Specialist

Nico Sutmoller, Insulfoam Geofoam Specialist

Contact Nico Sutmoller, Geofoam Specialist

nico.sutmoller@insulfoam.com

Ask Nico to Connect on LinkedIn | Follow Insulfoam on LinkedIn

Read more on Insulfoam.com

How to change an existing sloped elevation in a building

Northwest Hospital Auditorium

Northwest Hospital Auditorium

The University of Washington operates the Northwest Hospital & Medical Center on the north end of Seattle.  Recently a remodel of one of the buildings included a change of use for an existing sloped floor lecture auditorium.  The space was redesigned to serve as a state of the art surgical facility to improve care and offer additional professional services for patients.  Part of the construction process involved changing the existing sloped elevation of a slab on grade floor to create a flat usable space for the new surgical suite.  The project Engineers specified InsulFoam GF EPS15 as a structural void fill to reverse the slope.  One of Insulfoam’s territory sales managers, Dan Michaels worked with the contractor to design a custom factory cut puzzle with shop drawing to minimize field fabrication on the job-site   Due to no access for heavy equipment and a prohibition of mechanical compaction noise required with standard soil fill, EPS Geofoam served as an excellent alternative lightweight structural fill material that provided a strong, stable sub-base for the new concrete floor slab.

Northwest Hospital Auditorium Leveling

Northwest Hospital Auditorium Leveling

Prior to this installation, the project manager with Abbott Construction of Seattle had not yet been involved with an EPS Geofoam project.  They received several furnish and installation bids from various sub-contractors as part of the prime bid package.  Abbott received several F&I bids as high as $23,000 from the sub-contractors.  Once the contract was awarded, the GC was considering a value engineering change order to eliminate the Geofoam due to initial high cost of the bids.  The PM contacted one of Insulfoam’s Geofoam Specialists for consultation and soon learned the EPS material package would cost less than $5,000.  Insulfoam provided the contractor education and installation techniques that demonstrated the low labor costs and the GC decided to self-perform the installation.  The PM was very happy to discover how simple the factory cut pieces went in less than 1 day and appreciated the service and fabrication tools that the Insulfoam representatives provided to ensure a smooth installation.
Northwest Hospital Auditorium Leveling

Northwest Hospital Auditorium Leveling

Northwest Hospital Auditorium Leveling

Northwest Hospital Auditorium Leveling

INSULFOAM GEOFOAM QUESTIONS?

Nico Sutmoller, Insulfoam Geofoam Specialist

Nico Sutmoller, Insulfoam Geofoam Specialist

Contact Nico Sutmoller, Geofoam Specialist

nico.sutmoller@insulfoam.com

Ask Nico to Connect on LinkedIn  |  Follow Insulfoam on LinkedIn

Read more on Insulfoam.com